A prime mover with a 40 ft or 45 ft flatbed trailer is the workhorse for construction materials: steel, pipes, beams and precast that are long and heavy but not tall.
At a glance
- Deck length
- About 40 ft (12.2 m) or 45 ft (13.7 m)
- Typical payload
- About 25–30 tonnes
- Long loads
- Extendable trailers on request
- Loading
- Crane, forklift or site crane
Common loads
- Steel bars, H-beams, I-beams and steel structures
- Pipes (steel, HDPE, concrete) and HDD drill pipes
- Spun piles, precast beams, drains and culverts
- Site cabins, containers on flat deck, bundled timber
- Machinery that does not need a low deck
Flatbed or low loader?
Use a flatbed when the load is long and heavy but not tall. Use a low loader when the load is tall (such as an excavator) or must drive on. If you are not sure, send us the size and we choose.
What we need from you
- Total weight and number of pieces
- Longest length (important for long loads)
- How it will be loaded and unloaded (crane, forklift)
- Site access: road width, gates, height limits
Sizes are typical Malaysian ranges. The exact truck depends on availability and is confirmed in the quotation.
Common questions
How long can a flatbed load be?
A standard trailer is about 40–45 ft. Longer loads such as piles or beams may need an extendable trailer and a permit. Send us the length.
Who loads and unloads?
Usually the customer arranges a crane or forklift at both ends. If you have no crane, ask about a lorry crane (hiab) instead.
Can one trailer carry mixed materials?
Yes, if the total weight is within the limit and the load can be secured safely. Tell us the list of items.
Related pages
Request a quotation
Tell us what you need to move. We reply with the truck type and a quotation after checking availability.